Process Equipment and Plant Design Oxygen carrying pipelines in chemical industries are coloured with __________ colour. Yellow Red Black Blue Yellow Red Black Blue ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In distillation columns, bubble caps are held in place over trays by Both B and C Rivets Bolts A hold down bar Both B and C Rivets Bolts A hold down bar ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Nominal size of a pipe is an indication of its __________ diameter. Outer Inner None of these Approximate Outer Inner None of these Approximate ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Hole diameter of the seive trays in the distillation column ranges from __________ mm. 12.5 to 18.5 L to 3 4 to 8 3 to 12.5 12.5 to 18.5 L to 3 4 to 8 3 to 12.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Minimum baffle spacing recommended in a shell and tube heat exchanger is equal to 40% of the I.D. of the shell 5 cms I.D. of the shell 25 cms 40% of the I.D. of the shell 5 cms I.D. of the shell 25 cms ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A minimum clearance of about __________ mm is maintained between the distillation column wall and the bubble cap. 38 76 95 19 38 76 95 19 ANSWER DOWNLOAD EXAMIANS APP