Process Equipment and Plant Design For a 25 mm hole drilled in plates to be rivetted, the shank diameter of the rivet should be __________ mm. 26 27 25 23 26 27 25 23 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Floating head heat exchangers are used for the Co-current heat transfer systems Counter-current heat transfer systems Heat transfer between corrosive fluids Cases where temperature difference between the shell and the tubes is more (>50°C) Co-current heat transfer systems Counter-current heat transfer systems Heat transfer between corrosive fluids Cases where temperature difference between the shell and the tubes is more (>50°C) ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Liquid redistribution should be done in a packed tower packed with raschig rings every 6 metres or __________ times the column diameter, whichever is lower. 15-20 10-12.5 5-7.5 2.5-3.0 15-20 10-12.5 5-7.5 2.5-3.0 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For a given design of bubble cap, the number of bubble caps to be used per tray is set by the All of these Allowable gas velocity through the slots Plate spacing Diameter of the column All of these Allowable gas velocity through the slots Plate spacing Diameter of the column ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The raio, (properller agitator dia/tank dia) is normally taken as 0.15-030 0.75-0.85 0.5-0.65 0.60-0.90 0.15-030 0.75-0.85 0.5-0.65 0.60-0.90 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Back-trapping in a distillation column results due to Low reflux ratio Low gas velocity Excessive liquid gradient over the tray High gas velocity Low reflux ratio Low gas velocity Excessive liquid gradient over the tray High gas velocity ANSWER DOWNLOAD EXAMIANS APP