Process Equipment and Plant Design For a 25 mm hole drilled in plates to be rivetted, the shank diameter of the rivet should be __________ mm. 26 27 25 23 26 27 25 23 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A single pass air heater is connected to a two pass unit. For the air flow rate and other conditions remaining the same, the film heat transfer co-efficient for air will vary in the ratio of 20.2 2 20.8 None of these 20.2 2 20.8 None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The minimum tray spacing in distillation column of diameter less than 3 ft is normally __________ inches. 34 24 18 6 34 24 18 6 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The optimum size ratio for two mixed reactors in series depends on the kinetics of the reaction and the conversion level. For reaction orders more than one, the Smaller reactor should come first Larger reactor should come first Equal sized reactors are the best None of these Smaller reactor should come first Larger reactor should come first Equal sized reactors are the best None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Generally, as the length of the liquid path on a tray is increased beyond 5 ft, the overall column efficiency Increases Remains same Decreases May increase or decrease depending upon the plate spacing Increases Remains same Decreases May increase or decrease depending upon the plate spacing ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design A claming section before the liquid flows into the downcomer is privided to Cool the liquid before it flows down Ensure better vapour-liquid contact Reduce the discharge fluctuation Permit release of entrained vapour in the liquid Cool the liquid before it flows down Ensure better vapour-liquid contact Reduce the discharge fluctuation Permit release of entrained vapour in the liquid ANSWER DOWNLOAD EXAMIANS APP