Process Equipment and Plant Design For a 25 mm hole drilled in plates to be rivetted, the shank diameter of the rivet should be __________ mm. 26 25 27 23 26 25 27 23 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Tube height in a calendria type evaporator is normally less than __________ metres. 5.5 1 3.5 2 5.5 1 3.5 2 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Maximum allowable vapour velocity in a bubble cap tower is determined by the Entrainment considerations None of these Diameter of the column Vapour density Entrainment considerations None of these Diameter of the column Vapour density ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The difficulty of liquid distribution in packed towers is accentuated, when the ratio of tower diameter to packing diameter is < 30 > 7 < 15 < 7 > 20 < 50 < 30 > 7 < 15 < 7 > 20 < 50 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a multipass shell and tube heat exchanger, the baffles on shell side is primarily provided for Fixing the tubes Reducing scale deposition Increasing pressure drop Creating turbulence Fixing the tubes Reducing scale deposition Increasing pressure drop Creating turbulence ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Pick out the wrong statement pertaining to the design of a long tube vertical evaporator. Steam is fed to the shell, whereas the liquor is filled inside the tube Liquor level is maintained at l/3rd to 1/2 of the height of the tube None of these Tube dia is 3-6 cms, while tube length in 3-6 metres Steam is fed to the shell, whereas the liquor is filled inside the tube Liquor level is maintained at l/3rd to 1/2 of the height of the tube None of these Tube dia is 3-6 cms, while tube length in 3-6 metres ANSWER DOWNLOAD EXAMIANS APP