Process Equipment and Plant Design Lessing ring is formed by the addition of a partition across the centre of a raschig ring, which results in an area increase of about __________ percent. 20 5 35 55 20 5 35 55 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Which of the following factors affect the pressure drop in a co-current gas-liquid absorption packed tower? Density and viscosity of fluids Fluid flow rates Size, shape, orientation and surface of the packing particles All of these Density and viscosity of fluids Fluid flow rates Size, shape, orientation and surface of the packing particles All of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Rate of filtrate delivery is inversely proportional to the Filtering area & the pressure difference driving force Viscosity of filtrate Both A & B Cake & filter medium resistance Filtering area & the pressure difference driving force Viscosity of filtrate Both A & B Cake & filter medium resistance ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, the 'tube pitch' is defined as the Shortest distance between two adj acent tube holes None of these Shortest centre to centre distance between adjacent tubes O.D. of the tube for square pitch Shortest distance between two adj acent tube holes None of these Shortest centre to centre distance between adjacent tubes O.D. of the tube for square pitch ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In which of the following evaporators, steam is fed inside the tube while the liquor is outside the tube? Long tube vertical evaporator Short tube vertical evaporator Horizontal tube evaporator None of these Long tube vertical evaporator Short tube vertical evaporator Horizontal tube evaporator None of these ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Large process vessels operating under extreme temperature and pressure conditions are normally clad/ lined with materials like stainless steel, aluminium, nickel & its alloys, copper & its alloys and titanium. The cladding thickness is generally about __________ percent of the total thickness. 30 to 40 1 to 5 10 to 20 40 to 50 30 to 40 1 to 5 10 to 20 40 to 50 ANSWER DOWNLOAD EXAMIANS APP