Process Equipment and Plant Design Lessing ring is formed by the addition of a partition across the centre of a raschig ring, which results in an area increase of about __________ percent. 20 35 55 5 20 35 55 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger, the shortest centre to centre distance between the adjacent tubes is Always less than the diameter of the tube Called tube pitch None of these Called tube clearance Always less than the diameter of the tube Called tube pitch None of these Called tube clearance ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design For identical operating conditions, the pressure drop over __________ tray is the highest out of the following. Counterflow Sieve Bubble cap Valve Counterflow Sieve Bubble cap Valve ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The dust collection efficiency of a cyclone separator Decreases with increase in gas flow rate None of these Is inversely proportional to the mass of the dust particle Is directly proportional to the radius of the dust particle path Decreases with increase in gas flow rate None of these Is inversely proportional to the mass of the dust particle Is directly proportional to the radius of the dust particle path ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Steam side heat transfer co-efficient for design consideration under ordinary condition can be assumed to be about __________ kcal/hr.m².°C. 2500 1250 15000 7500 2500 1250 15000 7500 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Frame thickness in the plate and frame filter press is normally in the range of __________ inches. 1 to 12 0.25 to 8 0.25 to 4 1 to 5 1 to 12 0.25 to 8 0.25 to 4 1 to 5 ANSWER DOWNLOAD EXAMIANS APP