Process Equipment and Plant Design Liquid/petroleum fuel storage tanks are built underground (as in case of petrol pumps), when the storage capacity is less than __________ kilolitres. 85 30 20 45 85 30 20 45 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger for a given heat transfer surface area, smaller diameter tubes are favoured as compared to larger diameter ones ; because the smaller diameter tubes Are less prone to fouling None of these Can be fitted into a smaller shell diameter hence the cost of the heat exchanger would be less Are easier to clean Are less prone to fouling None of these Can be fitted into a smaller shell diameter hence the cost of the heat exchanger would be less Are easier to clean ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Le/D for a Tee (used as elbow, entering run) would be around 60 350 200 5 60 350 200 5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In seive plate column, holes are drilled or punched in sizes ranging from 2.5 to 12 mm (5 mm being widely used). The hole pitch is normally __________ times the hole diameter to give the required hole area. 5 to 10 10 to 15 2.5 to 4.0 0.5 to 1.5 5 to 10 10 to 15 2.5 to 4.0 0.5 to 1.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a multipass shell and tube heat exchanger, the shell side cross flow area does not depend upon Clearance Pitch None of these Baffle spacing Clearance Pitch None of these Baffle spacing ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Elastic failure of a material occurs, when the tensile stress equals yield strength, yield point or the elastic limit. Also, the elastic failure occurs according to maximum strain theory, when the maximum tensile strain equals (where, σ = yield strength and E = modulus of elasticity) E/σ E Σ/E Σ E/σ E Σ/E Σ ANSWER DOWNLOAD EXAMIANS APP