Process Equipment and Plant Design Liquid/petroleum fuel storage tanks are built underground (as in case of petrol pumps), when the storage capacity is less than __________ kilolitres. 20 45 85 30 20 45 85 30 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design With increase in the reflux ratio for a fixed production from a continuous binary distillation column, the __________ decreases. Fixed charges initially Vapour & liquid load both Running cost of steam for reboiler Running cost of cooling water for condenser Fixed charges initially Vapour & liquid load both Running cost of steam for reboiler Running cost of cooling water for condenser ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Normally, the length to diameter ratio of rotary dryers varies form 4 to 10 and for its economic operation, the number of transfer units (NTU) for such dryers varies from 3.5-5.5 44119 7.5-10.0 1.5-2.5 3.5-5.5 44119 7.5-10.0 1.5-2.5 ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design In a shell and tube heat exchanger for a given heat transfer surface area, smaller diameter tubes are favoured as compared to larger diameter ones ; because the smaller diameter tubes Are less prone to fouling None of these Are easier to clean Can be fitted into a smaller shell diameter hence the cost of the heat exchanger would be less Are less prone to fouling None of these Are easier to clean Can be fitted into a smaller shell diameter hence the cost of the heat exchanger would be less ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design The absorption factor is defined as (where, S₁ = slope of the equilibrium curve, S₂ = slope of the operating line) S₂/S₁ 1/S₁.S₂ S₁/S₂ S₁.S₂ S₂/S₁ 1/S₁.S₂ S₁/S₂ S₁.S₂ ANSWER DOWNLOAD EXAMIANS APP
Process Equipment and Plant Design Weep holes provided in the plates of a distillation column Are normally located near the overflow weir so that any delivery of liquid during operation follows approximately the same path as the overflow fluid Must be large enough (usually 1/4" to 5/8" dia) to prevent plugging but should not deliver excessive amount of fluid during operation All of these Facilitate draining out liquid from a tray when the unit is not in operation Are normally located near the overflow weir so that any delivery of liquid during operation follows approximately the same path as the overflow fluid Must be large enough (usually 1/4" to 5/8" dia) to prevent plugging but should not deliver excessive amount of fluid during operation All of these Facilitate draining out liquid from a tray when the unit is not in operation ANSWER DOWNLOAD EXAMIANS APP