Process Equipment and Plant Design
A certain pressure vessel manufacturer avoids doing reinforcements calculations for openings by always providing a reinforcing pad extending upto double the diameter of the opening and of the same material and thickness as that of the shell wall. If area compensation is accepted as a code guideline, his approach leads to safe design

Only if the opening is on spherical vessel
Only if the opening is on a vertical cylinderical vessel
Irrespective of the shape of the vessel
Only if the opening is on a horizontal cylinderical vessel

ANSWER DOWNLOAD EXAMIANS APP

Process Equipment and Plant Design
Pick out the wrong statement pertaining to the comparative evaluation of performance of the packed tower and the plate tower.

Plate tower is perferred, if interstage cooling is required to remove heats of reaction or solution
Plate tower is preferred over packed tower, if the operation involves liquids containing dispersed solids
In operations involving large temperature changes. (e.g. distillation), plate towers are preferred over packed towers as the packing may be crushed due to large temperature changes
The total weight of a dry plate tower is usually much more than that of a dry packed tower designed for the same duty

ANSWER DOWNLOAD EXAMIANS APP