Waste Water Engineering The intensity of rain is expressed in cm/minute cm/hour cm/day None of these cm/minute cm/hour cm/day None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 1 3 to 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D8/3 = 4 b8/3 D3/8 = 4 b3/8 D3/2 = 4 b3/2 D2/3 = 4 b2/3 D8/3 = 4 b8/3 D3/8 = 4 b3/8 D3/2 = 4 b3/2 D2/3 = 4 b2/3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.50 m/sec 0.70 m/sec 0.75 m/sec 0.60 m/sec 0.50 m/sec 0.70 m/sec 0.75 m/sec 0.60 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 15 days 60 days 90 days 30 days 15 days 60 days 90 days 30 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The following is the physical characteristic of sewage All listed here Colour Turbidity Odour All listed here Colour Turbidity Odour ANSWER DOWNLOAD EXAMIANS APP