Waste Water Engineering For sewers, inverted siphon is provided for Two pipes Four pipes Three pipes One pipe Two pipes Four pipes Three pipes One pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sludge digestion tank if the moisture content of sludge V1 litres is reduced from p1 % to p2 % the volume V2 is [(100 – P1)/(100 – P2)] V1 [(100 + P2)/(100 – P1)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P1)/(100 – P2)] V1 [(100 – P1)/(100 – P2)] V1 [(100 + P2)/(100 – P1)] V1 [(100 – P1)/(100 + P2)] V1 [(100 + P1)/(100 – P2)] V1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Branch sewer Sewer outfall Lateral sewer House sewer Branch sewer Sewer outfall Lateral sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains Methane Oxygen Hydrogen sulphide Carbon dioxide Methane Oxygen Hydrogen sulphide Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 200 m 150 m 300 m 100 m 200 m 150 m 300 m 100 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal value of over flow rates for plain primary sedimentation tanks, ranges between 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP