Waste Water Engineering For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is 24 m 20 m 16 m 30 m 24 m 20 m 16 m 30 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering No treatment of the sewage is given if dilution factor is Between 200 to 300 More than 500 Less than 150 Between 150 to 200 Between 200 to 300 More than 500 Less than 150 Between 150 to 200 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For efficient working of a sewer, it must be ensured that Neither (A) nor (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Neither (A) nor (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 5.5 m 7 m 6.5 m 5 m 5.5 m 7 m 6.5 m 5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers the highest non-scouring velocity is achieved in Cement concrete sewers Stone ware sewers Cast iron sewers Glazed bricks sewers Cement concrete sewers Stone ware sewers Cast iron sewers Glazed bricks sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ‘Cowl’ is provided at Upper end of ventilating column Upper end of the manhole First step in manhole Lower end of ventilating column Upper end of ventilating column Upper end of the manhole First step in manhole Lower end of ventilating column ANSWER DOWNLOAD EXAMIANS APP