Waste Water Engineering The sewage is pumped up From flat areas From low lying areas All listed here From basements From flat areas From low lying areas All listed here From basements ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 3 to 5 2 to 3 5 to 10 1 3 to 5 2 to 3 5 to 10 1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The laying of sewers is done with Theodolite Level Clinometer Magnetic compass Theodolite Level Clinometer Magnetic compass ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A nuisance is experienced in diluting water if dilution factor is less than 100 20 40 60 100 20 40 60 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal value of over flow rates for plain primary sedimentation tanks, ranges between 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For large sewers, maximum distance between manholes may be 200 m 300 m 50 m 100 m 200 m 300 m 50 m 100 m ANSWER DOWNLOAD EXAMIANS APP