Waste Water Engineering The average temperature of sewage in India, is 15°C 10°C 20°C 25°C 15°C 10°C 20°C 25°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 15 cumecs, the depth d and width are related by For drains up to d = 0.5 B d = 0.2 B B = 0.2 d B = 0.5 d d = 0.5 B d = 0.2 B B = 0.2 d B = 0.5 d ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be > 1.5 m 1.2 m 0.9 cm 1.5 m > 1.5 m 1.2 m 0.9 cm 1.5 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Both silting and scouring occur at the bottom The bottom is scoured Neither silting nor scouring occurs at the bottom The bottom is silted Both silting and scouring occur at the bottom The bottom is scoured Neither silting nor scouring occurs at the bottom The bottom is silted ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In Chezy’s formula V = C rs for calculating the velocity of flow in circular sewer of diameter running full, the value of hydraulic mean radius is D/1 D/4 D/3 D/2 D/1 D/4 D/3 D/2 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settlement velocity of a solid (diameter 0.5 mm, specific gravity 1.75) in water having temperature 10°C, is 213.5 cm/sec 413.5 cm/sec 500 cm/sec 313.5 cm/sec 213.5 cm/sec 413.5 cm/sec 500 cm/sec 313.5 cm/sec ANSWER DOWNLOAD EXAMIANS APP