Waste Water Engineering R.M.O. expenses include Running expenses All of these Maintenance expenses Operation expenses Running expenses All of these Maintenance expenses Operation expenses ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 2 to 3 3 to 5 1 5 to 10 2 to 3 3 to 5 1 5 to 10 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum All listed here The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 20°C 15°C 0°C 25°C 20°C 15°C 0°C 25°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the depletion of oxygen is found to be 2.5 mg/litre after incubating 2.5 ml of sewage diluted to 250 ml for 5 days at 20°C, B.O.D. of the sewage is 50 mg/l 150 mg/l 100 mg/l 250 mg/l 50 mg/l 150 mg/l 100 mg/l 250 mg/l ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is Reciprocating pump Pneumatic ejector Centrifugal pump None of these Reciprocating pump Pneumatic ejector Centrifugal pump None of these ANSWER DOWNLOAD EXAMIANS APP