Waste Water Engineering Disposal to sewage in large cities, is done in Purification Oxidation Irrigation Dilution Purification Oxidation Irrigation Dilution ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 15 cumecs, the depth d and width are related by For drains up to B = 0.2 d B = 0.5 d d = 0.5 B d = 0.2 B B = 0.2 d B = 0.5 d d = 0.5 B d = 0.2 B ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 6 hours 8 hours 2 hours 4 hours 6 hours 8 hours 2 hours 4 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from City Out-fall Any point Tail end City Out-fall Any point Tail end ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Drop manholes are the manholes With depths more than 3.5 m Having drains at different levels Without entry ladders Without manhole covers With depths more than 3.5 m Having drains at different levels Without entry ladders Without manhole covers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Water content of sewage is about 0.999 0.99 0.9 0.95 0.999 0.99 0.9 0.95 ANSWER DOWNLOAD EXAMIANS APP