Waste Water Engineering Disposal to sewage in large cities, is done in Purification Irrigation Dilution Oxidation Purification Irrigation Dilution Oxidation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering An inverted siphon is designed generally for Two pipes One pipe Four pipes Three pipes Two pipes One pipe Four pipes Three pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept All of these Flow velocity 0.15 m to 0.3 m/sec is kept One minute of detention period is kept Depth of 0.9 m to 1.20 m is kept All of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer manholes are generally provided at The change of gradient The junctions of sewers All of these The change of direction The change of gradient The junctions of sewers All of these The change of direction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by R.C.C. Cast iron P.C.C. Glazed stonewares R.C.C. Cast iron P.C.C. Glazed stonewares ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge in septic tanks is recommended as 25 litres/person/year 30 litres/person/year 30 litres/person/month 25 litres/person/month 25 litres/person/year 30 litres/person/year 30 litres/person/month 25 litres/person/month ANSWER DOWNLOAD EXAMIANS APP