Waste Water Engineering No treatment of the sewage is given if dilution factor is Less than 150 Between 150 to 200 More than 500 Between 200 to 300 Less than 150 Between 150 to 200 More than 500 Between 200 to 300 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 7 days 14 days 12 days 2 days 7 days 14 days 12 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If q is the average sewage flow from a city of population P, the maximum sewage flow Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + )/(4 + )] q Q = [(4 + )/(18 + )] q Q = [(18 + P)/(4 + )] q Q = [(5 + )/((15 + )] q Q = [(18 + )/(4 + )] q ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is None of these Alkaline fermentation Acid regression Acid fermentation None of these Alkaline fermentation Acid regression Acid fermentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 5 minutes 3 minutes 1 minute 2 minutes 5 minutes 3 minutes 1 minute 2 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a continuous flow type of sedimentation tanks Length of the tank is normally kept 4 to 5 times the width All listed here Maximum horizontal flow velocity is limited to 0.3 m/minute Width of the tank is normally kept about 6 m Length of the tank is normally kept 4 to 5 times the width All listed here Maximum horizontal flow velocity is limited to 0.3 m/minute Width of the tank is normally kept about 6 m ANSWER DOWNLOAD EXAMIANS APP