Waste Water Engineering In septic tanks, Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum All listed here The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum All listed here The clear space between the baffle top and covering slab is about 7.5 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 3.5 to 4.5 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 4.5 to 5.5 m/sec 2.5 to 3.0 m/sec 3.0 to 4.0 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dried sewage after treatment is used as Chemical for lowering B.O.D. Fertilizer Base material for paints Building material Chemical for lowering B.O.D. Fertilizer Base material for paints Building material ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is continued till stability Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The formula V = (1/n) r2/3 Chezy’s formula Bazin’s formula Manning’s formula Kutter’s formula Chezy’s formula Bazin’s formula Manning’s formula Kutter’s formula ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Top of larger sewer is kept lower None of these Tops of both the sewers are at the same level Top of smaller sewer is kept lower Top of larger sewer is kept lower None of these Tops of both the sewers are at the same level Top of smaller sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP