Waste Water Engineering
In septic tanks,

Free board of 0.3 m may be provided
The baffles or tees are extended up to top level of scum
All listed here
The clear space between the baffle top and covering slab is about 7.5 cm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In the activated sludge process

Aeration is continued till stability
Water is removed by centrifugal action
Sludge is activated by constant stirring
Aeration is done with an admixture of previously aerated sludge

ANSWER DOWNLOAD EXAMIANS APP