Waste Water Engineering In septic tanks, The baffles or tees are extended up to top level of scum All listed here The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum All listed here The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by Glazed stonewares Cast iron P.C.C. R.C.C. Glazed stonewares Cast iron P.C.C. R.C.C. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 2 to 3 5 to 10 3 to 5 1 2 to 3 5 to 10 3 to 5 1 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a sedimentation tank (length L, width B, depth D) the settling velocity of a particle for a discharge Q, is Q/L Q/(B × L) Q/(B × D) Q/(L × D) Q/L Q/(B × L) Q/(B × D) Q/(L × D) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Kjeldahl nitrogen is a mixture of Ammonia and nitrogen Organic nitrogen and ammonia All listed here Nitrogen and organic nitrogen Ammonia and nitrogen Organic nitrogen and ammonia All listed here Nitrogen and organic nitrogen ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Ventilating shafts are provided to a sewer line at every 200 m 100 m 150 m 300 m 200 m 100 m 150 m 300 m ANSWER DOWNLOAD EXAMIANS APP