Waste Water Engineering In septic tanks, All listed here The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum All listed here The clear space between the baffle top and covering slab is about 7.5 cm Free board of 0.3 m may be provided The baffles or tees are extended up to top level of scum ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For providing an Indian type W.C., the R.C.C. slabs in the toilet portion Need not be sunk Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm Should be sunk by 50 cm Need not be sunk Should be kept 20 cm above the adjacent portion Should be sunk by 20 cm Should be sunk by 50 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The laying of sewers is done with Magnetic compass Level Clinometer Theodolite Magnetic compass Level Clinometer Theodolite ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Neither silting nor scouring occurs at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge per person per year, is 20 litres 15 litres 25 litres 10 litres 20 litres 15 litres 25 litres 10 litres ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 50 m to 100 m 150 m to 300 m 25 to 50 m 100 m to 150 m 50 m to 100 m 150 m to 300 m 25 to 50 m 100 m to 150 m ANSWER DOWNLOAD EXAMIANS APP