Waste Water Engineering The screens are fixed Parallel to the direction of flow Perpendicular to the direction of flow At an angle 30° to 60° to the direction of flow None of these Parallel to the direction of flow Perpendicular to the direction of flow At an angle 30° to 60° to the direction of flow None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The asbestos cement pipes are generally laid Horizontally At an angle of 30° At an angle of 60° Vertically Horizontally At an angle of 30° At an angle of 60° Vertically ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Cement concrete sewers are only suitable if non-scouring velocity is between 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec 4.5 to 5.5 m/sec 3.0 to 4.0 m/sec 3.5 to 4.5 m/sec 2.5 to 3.0 m/sec 4.5 to 5.5 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Irrigation Dilution Purification Oxidation Irrigation Dilution Purification Oxidation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The following is the physical characteristic of sewage Colour Odour Turbidity All listed here Colour Odour Turbidity All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 3.5 years 5 years 4 years 3 years 3.5 years 5 years 4 years 3 years ANSWER DOWNLOAD EXAMIANS APP