Waste Water Engineering The screens are fixed Perpendicular to the direction of flow None of these Parallel to the direction of flow At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow None of these Parallel to the direction of flow At an angle 30° to 60° to the direction of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Acid regression Alkaline fermentation Acid fermentation None of these Acid regression Alkaline fermentation Acid fermentation None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers Branch sewers All listed here Main sewers Trunk sewers Branch sewers All listed here Main sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of the diameter of a circular section and the side of a square section hydraulically equivalent, is 1.095 1.065 1.075 1.085 1.095 1.065 1.075 1.085 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pressure exerted by Pressure sewers are designed to be safe in tension All listed here The sewage when running full from inside, is called internal pressure The internal pressure if any, causes tensile stress in the pipe material Pressure sewers are designed to be safe in tension All listed here The sewage when running full from inside, is called internal pressure The internal pressure if any, causes tensile stress in the pipe material ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 1 3 to 5 ANSWER DOWNLOAD EXAMIANS APP