Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Twice the average demand Thrice the average demand Average demand Four times the average demand Twice the average demand Thrice the average demand Average demand Four times the average demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of a sewer is kept 10 cm 15 cm 20 cm 25 cm 10 cm 15 cm 20 cm 25 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the flame of a miner's safety lamp in the upper layers of the sewer forms an explosive, the sewer certainly contains Methane Carbon dioxide Oxygen Hydrogen sulphide Methane Carbon dioxide Oxygen Hydrogen sulphide ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers the gas generally found, is All listed here Methane (CH4) Carbon dioxide (CO2) Hydrogen sulphide (H2S) All listed here Methane (CH4) Carbon dioxide (CO2) Hydrogen sulphide (H2S) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if A sewer drops from a height None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level A sewer drops from a height None of these A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Removal of oil and grease from sewage, is known Skimming Screening None of these Filtration Skimming Screening None of these Filtration ANSWER DOWNLOAD EXAMIANS APP