In case of sewer lines

Test for straightness is carried out with the help of a lamp and mirror
Obstruction test is carried out with the help of smooth ball of diameter 13 mm
All listed here
Water test is carried out to check water tightness of the joints

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The sewers

Must be laid at least 2 to 3 m deep to collect /water from the basements
Must flow under gravity ½ to ¾ full
All listed here
Must be of adequate size to avoid over flow