Waste Water Engineering A manhole is generally provided at each Bend Change of gradient All of these Junction Bend Change of gradient All of these Junction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most efficient cross-section of sewers in a combined sewerage system is Rectangular New egged Parabolic Circular Rectangular New egged Parabolic Circular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic activity is maximum In freshly produced sewage In sewer treatment plants At sewer pipes None of these In freshly produced sewage In sewer treatment plants At sewer pipes None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas evolved in sewers is All of these Carbondioxide Hydrogen sulphide Methane All of these Carbondioxide Hydrogen sulphide Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic bacterias Oxidise organic matter in sewage Flourish in the presence of free oxygen All of these Consume organic matter as their food Oxidise organic matter in sewage Flourish in the presence of free oxygen All of these Consume organic matter as their food ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be 1.5 m > 1.5 m 1.2 m 0.9 cm 1.5 m > 1.5 m 1.2 m 0.9 cm ANSWER DOWNLOAD EXAMIANS APP