Waste Water Engineering A manhole is generally provided at each Change of gradient All of these Bend Junction Change of gradient All of these Bend Junction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Which one of the following statements regarding septic tanks is wrong? The depth of tank is kept equal to its width The outlet invert level is kept 5 to 7.5 cm below the inlet invert level A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided The minimum width of septic level is 90 cm The depth of tank is kept equal to its width The outlet invert level is kept 5 to 7.5 cm below the inlet invert level A gap of 7.5 cm between the bottom of the covering slab and the top level of scum is provided The minimum width of septic level is 90 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A jar A test tube An Imhoff cone A breaker A jar A test tube An Imhoff cone A breaker ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A rain sanitary sewer is constructed to carry Ground water Storm sewage Sanitary sewage Surface water Ground water Storm sewage Sanitary sewage Surface water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The screens are fixed Parallel to the direction of flow None of these At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow Parallel to the direction of flow None of these At an angle 30° to 60° to the direction of flow Perpendicular to the direction of flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank None of these A particle to travel along its length A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank None of these A particle to travel along its length ANSWER DOWNLOAD EXAMIANS APP