Waste Water Engineering For design of sewers, percentage of sewage discharge is assumed 65 to 70% 0.85 75 to 80% 70 to 75% 65 to 70% 0.85 75 to 80% 70 to 75% ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by Glazed stonewares Cast iron R.C.C. P.C.C. Glazed stonewares Cast iron R.C.C. P.C.C. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A rain sanitary sewer is constructed to carry Surface water Sanitary sewage Ground water Storm sewage Surface water Sanitary sewage Ground water Storm sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 1 minute 2 minutes 5 minutes 3 minutes 1 minute 2 minutes 5 minutes 3 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is 1 in 60 1 in 100 1 in 120 None of these 1 in 60 1 in 100 1 in 120 None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is None of these 1 in 100 1 in 120 1 in 60 None of these 1 in 100 1 in 120 1 in 60 ANSWER DOWNLOAD EXAMIANS APP