Waste Water Engineering The recommended detention period for grit chambers is 1 minute 5 minutes 2 minutes 3 minutes 1 minute 5 minutes 2 minutes 3 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by P.C.C. R.C.C. Cast iron Glazed stonewares P.C.C. R.C.C. Cast iron Glazed stonewares ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 30 minutes 2 hours 1 hour and 30 minutes 1 hour 30 minutes 2 hours 1 hour and 30 minutes 1 hour ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Neither silting nor scouring occurs at the bottom The bottom is silted Both silting and scouring occur at the bottom The bottom is scoured Neither silting nor scouring occurs at the bottom The bottom is silted Both silting and scouring occur at the bottom The bottom is scoured ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at Distances 150 m to 300 m Every change in the size of sewers All listed here Upper ends of branch sewers Distances 150 m to 300 m Every change in the size of sewers All listed here Upper ends of branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Oxidation process results in the formation of Carbon dioxide Sulphates All of these Nitrates Carbon dioxide Sulphates All of these Nitrates ANSWER DOWNLOAD EXAMIANS APP