Waste Water Engineering The recommended detention period for grit chambers is 5 minutes 1 minute 3 minutes 2 minutes 5 minutes 1 minute 3 minutes 2 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Out-fall sewer Branch sewer House sewer Main sewer Out-fall sewer Branch sewer House sewer Main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Aeration is continued till stability Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Water is removed by centrifugal action Aeration is continued till stability Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Water is removed by centrifugal action ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system consists of Branch sewer Lateral sewer All of these House sewer Branch sewer Lateral sewer All of these House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the discharge of a sewer running half is 628 1.p.s., i = 0.001, and n = 0.010, the diameter of the sewer, is 1.69 m 1.49 m 1.59 m 1.39 m 1.69 m 1.49 m 1.59 m 1.39 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit and silt of the grit chambers, may not be used for Both A and B Raising low lying areas by dumping Neither A nor B Concreting Both A and B Raising low lying areas by dumping Neither A nor B Concreting ANSWER DOWNLOAD EXAMIANS APP