Waste Water Engineering The reduced levels of the string at the consecutive sight rails A and B are 203.575 m, 203.475 m respectively. If the difference of their R.D.s is 10 m, the gradient of the sewer line is 1 in 500 upward 1 in 503 upward 1 in 100 upward 1 in 100 downward 1 in 500 upward 1 in 503 upward 1 in 100 upward 1 in 100 downward ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dry weather flow is: Average monthly rate of flow Average daily rate of flow Average annual rate of flow Water supply allowance per capita Average monthly rate of flow Average daily rate of flow Average annual rate of flow Water supply allowance per capita ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Tops of both the sewers are at the same level None of these Top of smaller sewer is kept lower Top of larger sewer is kept lower Tops of both the sewers are at the same level None of these Top of smaller sewer is kept lower Top of larger sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which received discharge from two or more main sewers, is known as A trunk sewer An outfall sewer An intercepting sewer A main sewer A trunk sewer An outfall sewer An intercepting sewer A main sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Carbon dioxide All listed here Ammonia Hydrogen Carbon dioxide All listed here Ammonia Hydrogen ANSWER DOWNLOAD EXAMIANS APP