Sewer ventilating columns are generally placed at

Distances 150 m to 300 m
Upper ends of branch sewers
Every change in the size of sewers
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
In the activated sludge process

Aeration is done with an admixture of previously aerated sludge
Aeration is continued till stability
Water is removed by centrifugal action
Sludge is activated by constant stirring

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The sewers

Must be laid at least 2 to 3 m deep to collect /water from the basements
All listed here
Must flow under gravity ½ to ¾ full
Must be of adequate size to avoid over flow