Waste Water Engineering Sewer ventilating columns are generally placed at Every change in the size of sewers Upper ends of branch sewers All listed here Distances 150 m to 300 m Every change in the size of sewers Upper ends of branch sewers All listed here Distances 150 m to 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 50 mm 40 mm 30 mm 20 mm 50 mm 40 mm 30 mm 20 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If D is the diameter of a circular sewer and D’ is the top horizontal diameter of an equivalent egg shaped section, the relationship which holds good, is D’ = 0.94 D D’ = 0.84 D D’ = 0.74 D D’ = 0.64 D D’ = 0.94 D D’ = 0.84 D D’ = 0.74 D D’ = 0.64 D ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A five day B.O.D. at 15°C of the sewage of a town is 100 kg/day. If the 5 day B.O.D. per head at 15°C for standard sewage is 0.1 kg/day, the population equivalent is 5000 1000 10000 100 5000 1000 10000 100 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The flow velocity in detritus tanks is 0.05 m/sec None of these 0.09 m/sec 1.25 m/sec 0.05 m/sec None of these 0.09 m/sec 1.25 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers The men entering the manhole should be advised to smoke in the sewer The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Proper tests for the presence of poisonous gases must be carried out Warning signals should be erected The men entering the manhole should be advised to smoke in the sewer The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Proper tests for the presence of poisonous gases must be carried out Warning signals should be erected ANSWER DOWNLOAD EXAMIANS APP