Waste Water Engineering The settlement velocity of a solid (diameter 0.5 mm, specific gravity 1.75) in water having temperature 10°C, is 500 cm/sec 313.5 cm/sec 413.5 cm/sec 213.5 cm/sec 500 cm/sec 313.5 cm/sec 413.5 cm/sec 213.5 cm/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The intensity of rain is expressed in cm/day cm/hour cm/minute None of these cm/day cm/hour cm/minute None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewers designed with self cleansing velocity, Neither silting nor scouring occurs at the bottom The bottom is scoured The bottom is silted Both silting and scouring occur at the bottom Neither silting nor scouring occurs at the bottom The bottom is scoured The bottom is silted Both silting and scouring occur at the bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 0°C 20°C 25°C 15°C 0°C 20°C 25°C 15°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec Organic and inorganic materials are separated Detention period is kept 3 to 4 minutes All listed here Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP