Waste Water Engineering The following is the physical characteristic of sewage All listed here Colour Odour Turbidity All listed here Colour Odour Turbidity ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, Detention period is kept 3 to 4 minutes All listed here Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes All listed here Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead caulked joints are used for laying Stone ware pipes I. pipes Earthenware pipes G.I. pipes Stone ware pipes I. pipes Earthenware pipes G.I. pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of minimum hourly flow to the average flow of sewage is 43834 43833 43832 43894 43834 43833 43832 43894 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In SI units the power of sound is represented in Kgs Joules Newtons Watts Kgs Joules Newtons Watts ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer that unloads the sewage at the point of treatment is called Main sewer Branch sewer House sewer Outfall sewer Main sewer Branch sewer House sewer Outfall sewer ANSWER DOWNLOAD EXAMIANS APP