Waste Water Engineering Clogging of sewers, is caused due to Silting Low discharge All of these Greasy and oily matters Silting Low discharge All of these Greasy and oily matters ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Acid regression stage of sludge digestion at a temperature 21°C extends over a period of 60 days 15 days 30 days 90 days 60 days 15 days 30 days 90 days ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, decomposition of organic bacteria, is done by None of these Aerobic bacteria Anaerobic bacteria Both types of bacterias None of these Aerobic bacteria Anaerobic bacteria Both types of bacterias ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The flow velocity in detritus tanks is 0.09 m/sec None of these 1.25 m/sec 0.05 m/sec 0.09 m/sec None of these 1.25 m/sec 0.05 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 4 years 3 years 5 years 3.5 years 4 years 3 years 5 years 3.5 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a peak discharge of 0.0157 cumec, with a velocity of 0.9 m/sec, the diameter of the sewer main, is 18 cm 10 cm 12 cm 15 cm 18 cm 10 cm 12 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP