Waste Water Engineering The pH value of fresh sewage is usually Equal to zero More than 7 Less than 7 Equal to 7 Equal to zero More than 7 Less than 7 Equal to 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if None of these A branch sewer joins the main sewer at higher level A sewer drops from a height A lamp is inserted to check obstruction None of these A branch sewer joins the main sewer at higher level A sewer drops from a height A lamp is inserted to check obstruction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Before discharging the foul sewage into rivers, it is generally treated by Sedimentation Oxidation All listed here Screening Sedimentation Oxidation All listed here Screening ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers All listed here Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow Must be laid at least 2 to 3 m deep to collect /water from the basements All listed here Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow Must be laid at least 2 to 3 m deep to collect /water from the basements ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The stone ware sewers After casting are dried and burnt at temperature 150°C, 700°C and 1200°C All listed here Are used for carrying sewage and drainage from houses Are manufactured from clays and shale After casting are dried and burnt at temperature 150°C, 700°C and 1200°C All listed here Are used for carrying sewage and drainage from houses Are manufactured from clays and shale ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 24 to 36 hours 8 to 16 hours 16 to 24 hours 4 to 8 hours 24 to 36 hours 8 to 16 hours 16 to 24 hours 4 to 8 hours ANSWER DOWNLOAD EXAMIANS APP