Waste Water Engineering The pH value of sewage is determined with the help of Turbid meter Imhoff Cone None of these Potentiometer Turbid meter Imhoff Cone None of these Potentiometer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the end of septic tanks On manholes At the beginning of sewer line With a W.'trap At the end of septic tanks On manholes At the beginning of sewer line With a W.'trap ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 30 minutes 1 hour 1 hour and 30 minutes 2 hours 30 minutes 1 hour 1 hour and 30 minutes 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the rugosity coefficient, is the bed slope of sewer, the velocity of flow in m/sec may be obtained by the formula V = (1/n) r2/3 s1/2 evolved by Chezy Bazin Kutter Manning Chezy Bazin Kutter Manning ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.50 m/sec 0.75 m/sec 0.60 m/sec 0.70 m/sec 0.50 m/sec 0.75 m/sec 0.60 m/sec 0.70 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In septic tanks, Free board of 0.3 m may be provided The clear space between the baffle top and covering slab is about 7.5 cm All listed here The baffles or tees are extended up to top level of scum Free board of 0.3 m may be provided The clear space between the baffle top and covering slab is about 7.5 cm All listed here The baffles or tees are extended up to top level of scum ANSWER DOWNLOAD EXAMIANS APP