Waste Water Engineering
¾th or ¼th extra space is left in sewer pipes at maximum discharge for

Unexpected increase in population
Large scale infiltration of storm water
Low estimates of the average and maximum flows
All listed here

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The sewers

Must be laid at least 2 to 3 m deep to collect /water from the basements
All listed here
Must flow under gravity ½ to ¾ full
Must be of adequate size to avoid over flow

ANSWER DOWNLOAD EXAMIANS APP