Waste Water Engineering The underground sewers are more subjected to Compressive force Shearing force Tensile force Bending force Compressive force Shearing force Tensile force Bending force ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is 30 m 16 m 20 m 24 m 30 m 16 m 20 m 24 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The normal values of over flow rates for sedimentation tanks using coagulant, ranges between 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be of adequate size to avoid over flow All listed here Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements Must be of adequate size to avoid over flow All listed here Must flow under gravity ½ to ¾ full Must be laid at least 2 to 3 m deep to collect /water from the basements ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours 4 to 8 hours 24 to 36 hours 16 to 24 hours 8 to 16 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A circular sewer section is preferred to because It provides maximum area for a given perimeter All listed here It is cheaper in construction It provides maximum hydraulic mean depth It provides maximum area for a given perimeter All listed here It is cheaper in construction It provides maximum hydraulic mean depth ANSWER DOWNLOAD EXAMIANS APP