Waste Water Engineering If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is 1 in 60 None of these 1 in 100 1 in 120 1 in 60 None of these 1 in 100 1 in 120 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Oil and grease are removed from skimming tanks Floating materials are removed by screening All listed here Girt and sand are removed by girt chambers Oil and grease are removed from skimming tanks Floating materials are removed by screening All listed here Girt and sand are removed by girt chambers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 90 cm 80 cm 50 cm 100 cm 90 cm 80 cm 50 cm 100 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed 2 1.5 3 2.5 2 1.5 3 2.5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Setting out the alignments of sewers may start from Tail end Out-fall City Any point Tail end Out-fall City Any point ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Oxidation process results in the formation of Nitrates Sulphates All of these Carbon dioxide Nitrates Sulphates All of these Carbon dioxide ANSWER DOWNLOAD EXAMIANS APP