Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to All listed here Weight of the back fill Superimposed traffic loads Weight of the pipe All listed here Weight of the back fill Superimposed traffic loads Weight of the pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A nuisance is experienced in diluting water if dilution factor is less than 40 100 60 20 40 100 60 20 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the beginning of sewer line At the end of septic tanks With a W.'trap On manholes At the beginning of sewer line At the end of septic tanks With a W.'trap On manholes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains With beds of rocks and gravels Lined with stones Neither A. nor B. Both A. and B. With beds of rocks and gravels Lined with stones Neither A. nor B. Both A. and B. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 4 years 5 years 3 years 3.5 years 4 years 5 years 3 years 3.5 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering When drainage to sewage ratio is 20, the peak dry weather flow is None of these Slightly less than 5% of the design discharge 20% of the design discharge Slightly more than 5% of the design discharge None of these Slightly less than 5% of the design discharge 20% of the design discharge Slightly more than 5% of the design discharge ANSWER DOWNLOAD EXAMIANS APP