Waste Water Engineering If the grit in grit chambers is 4.5 million litres per day, its cleaning is done Hydraulically Manually Mechanically Electrically Hydraulically Manually Mechanically Electrically ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains With beds of rocks and gravels Neither A. nor B. Both A. and B. Lined with stones With beds of rocks and gravels Neither A. nor B. Both A. and B. Lined with stones ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design of sewers, percentage of sewage discharge is assumed 70 to 75% 65 to 70% 75 to 80% 0.85 70 to 75% 65 to 70% 75 to 80% 0.85 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In very first stage of decomposition of the organic matter in sewage Ammonia is formed Nitrates are formed Carbondioxide is formed Nitrites are formed Ammonia is formed Nitrates are formed Carbondioxide is formed Nitrites are formed ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 2 minutes 3 minutes 1 minute 5 minutes 2 minutes 3 minutes 1 minute 5 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a trickling filter Filtration process is used Biological action is used Both A and B Neither A nor B Filtration process is used Biological action is used Both A and B Neither A nor B ANSWER DOWNLOAD EXAMIANS APP