Waste Water Engineering If the grit in grit chambers is 4.5 million litres per day, its cleaning is done Mechanically Hydraulically Electrically Manually Mechanically Hydraulically Electrically Manually ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized segregation All of these Mechanized receipt Mechanized pulverising of refuse Mechanized segregation All of these Mechanized receipt Mechanized pulverising of refuse ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Inter-distance between ventilation columns in a sewer line is kept 50 m to 100 m 100 m to 150 m 150 m to 300 m 25 to 50 m 50 m to 100 m 100 m to 150 m 150 m to 300 m 25 to 50 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The drainage area of a town is 12 hectares. Its 40% area is hard pavement ( K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula Ps = 900/(t + 60) the maximum run off is 0.10 cumec 0.12 cumec 0.20 cumec 0.15 cumec 0.10 cumec 0.12 cumec 0.20 cumec 0.15 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The digested sludge from septic tanks, is removed after a maximum period of 3 years 5 years 3.5 years 4 years 3 years 5 years 3.5 years 4 years ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A well oxidized sewage contains nitrogen mainly as None of these Free ammonia Nitrates Nitrites None of these Free ammonia Nitrates Nitrites ANSWER DOWNLOAD EXAMIANS APP