Waste Water Engineering To prevent settling down of sewage both at the bottom and on the sides of a large sewer, self-cleaning velocity recommended for Indian conditions, is 0.50 m/sec 0.70 m/sec 0.60 m/sec 0.75 m/sec 0.50 m/sec 0.70 m/sec 0.60 m/sec 0.75 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Hazen’s formula VS = 418 (GS – Gw)d [(3T + 70)/100] is used for the settlement velocity of the particles of diameter Less than 0.01 mm Greater than 0.1 mm Less than 0.05 mm Less than 0.1 mm Less than 0.01 mm Greater than 0.1 mm Less than 0.05 mm Less than 0.1 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering House connections to the laterals is generally made by Glazed stonewares Cast iron P.C.C. R.C.C. Glazed stonewares Cast iron P.C.C. R.C.C. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The amount of oxygen consumed by the aerobic bacterias which cause the aerobic biological decomposition of sewage, is known Dissolved Oxygen (D.O.) None of these Bio-Chemical Oxygen Demand (B.O.D.) Chemical Oxygen Demand (C.O.D.) Dissolved Oxygen (D.O.) None of these Bio-Chemical Oxygen Demand (B.O.D.) Chemical Oxygen Demand (C.O.D.) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In the activated sludge process Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Water is removed by centrifugal action Sludge is activated by constant stirring Aeration is done with an admixture of previously aerated sludge Aeration is continued till stability Water is removed by centrifugal action ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a grit chamber of a sewage treatment plant, One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these One minute of detention period is kept Flow velocity 0.15 m to 0.3 m/sec is kept Depth of 0.9 m to 1.20 m is kept All of these ANSWER DOWNLOAD EXAMIANS APP