Waste Water Engineering Antisyphonage pipe is fitted With a W.'trap At the beginning of sewer line At the end of septic tanks On manholes With a W.'trap At the beginning of sewer line At the end of septic tanks On manholes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The discharge per unit plan area of a sedimentation tank, is generally called All of these Over flow velocity Over flow rate Surface loading All of these Over flow velocity Over flow rate Surface loading ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 22.5 cm c/c 50 cm c/c 30 cm c/c 15 cm c/c 22.5 cm c/c 50 cm c/c 30 cm c/c 15 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Dilution Oxidation Purification Irrigation Dilution Oxidation Purification Irrigation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During purification process of sewage the gas given off, is Hydrogen Ammonia Carbon dioxide All listed here Hydrogen Ammonia Carbon dioxide All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 1 ANSWER DOWNLOAD EXAMIANS APP