Waste Water Engineering Imhoff cone is used to measure Total solids Settleable solids Total organic solids Total in organic solids Total solids Settleable solids Total organic solids Total in organic solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes need be checked for Both A and B None of these Minimum flow Maximum flow Both A and B None of these Minimum flow Maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A sewer running partially full and hurried with back filled, fails in compression due to Weight of the pipe Weight of the back fill Superimposed traffic loads All listed here Weight of the pipe Weight of the back fill Superimposed traffic loads All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering hydraulically equivalent, the relationship which holds good, is D8/3 = 4 b8/3 D3/8 = 4 b3/8 D3/2 = 4 b3/2 D2/3 = 4 b2/3 D8/3 = 4 b8/3 D3/8 = 4 b3/8 D3/2 = 4 b3/2 D2/3 = 4 b2/3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sludge does not contain waste water from Kitchen sinks Toilets Wash basins Bath rooms Kitchen sinks Toilets Wash basins Bath rooms ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized pulverising of refuse Mechanized receipt Mechanized segregation All of these Mechanized pulverising of refuse Mechanized receipt Mechanized segregation All of these ANSWER DOWNLOAD EXAMIANS APP