Waste Water Engineering The asbestos cement sewers are Not structurally strong to bear large compressive stress All of these Light in weight Susceptible to corrosion by sulphuric acid Not structurally strong to bear large compressive stress All of these Light in weight Susceptible to corrosion by sulphuric acid ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length None of these A particle to travel from top surface to bottom sludge zone The flow of sewage to fill the tank A particle to travel along its length ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Before discharging the foul sewage into rivers, it is generally treated by Screening Oxidation Sedimentation All listed here Screening Oxidation Sedimentation All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers The men entering the manhole should be advised to smoke in the sewer Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Warning signals should be erected The men entering the manhole should be advised to smoke in the sewer Proper tests for the presence of poisonous gases must be carried out The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Warning signals should be erected ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The value of Chezy’s constant C = 157.6/(1.81 + K/ ) is used in Manning’s formula Kutter’s formula Chezy’s formula Bazin’s formula Manning’s formula Kutter’s formula Chezy’s formula Bazin’s formula ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called Plateau A heap Windrow None of these Plateau A heap Windrow None of these ANSWER DOWNLOAD EXAMIANS APP