Waste Water Engineering The normal value of over flow rates for plain primary sedimentation tanks, ranges between 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day 50,000 to 60,000 litres/sqm/day 80,000 to 100,000 litres/sqm/day 25,000 to 35,000 litres/sqm/day 40,000 to 50,000 litres/sqm/day ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In R.C. sewer pipes, the percentage longitudinal reinforcement to the cross-sectional area of concrete is kept 0.25 10 5 2 0.25 10 5 2 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Before discharging the foul sewage into rivers, it is generally treated by Oxidation All listed here Screening Sedimentation Oxidation All listed here Screening Sedimentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The factor responsible for purification of sewage in river is Hydrology Dissolved oxygen in water All listed here Temperature Hydrology Dissolved oxygen in water All listed here Temperature ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If 2% solution of a sewage sample is incubated for 5 days at 20°C and depletion of oxygen was found to be 5 ppm, B.O.D. of the sewage is 200 ppm 250 ppm None of these 225 ppm 200 ppm 250 ppm None of these 225 ppm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a rectangular sewer is twice its depth while discharging 1.5 m/sec. The width of the sewer is 1.36 m 0.68 m 0.88 m 1.76 m 1.36 m 0.68 m 0.88 m 1.76 m ANSWER DOWNLOAD EXAMIANS APP