Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called Plateau None of these Windrow A heap Plateau None of these Windrow A heap ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 3 minutes 2 minutes 1 minute 5 minutes 3 minutes 2 minutes 1 minute 5 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer pipes need be checked for Both A and B None of these Minimum flow Maximum flow Both A and B None of these Minimum flow Maximum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Lead caulked joints are used for laying G.I. pipes Earthenware pipes I. pipes Stone ware pipes G.I. pipes Earthenware pipes I. pipes Stone ware pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Hazen’s formula VS = 418 (GS – Gw)d [(3T + 70)/100] is used for the settlement velocity of the particles of diameter Less than 0.05 mm Greater than 0.1 mm Less than 0.01 mm Less than 0.1 mm Less than 0.05 mm Greater than 0.1 mm Less than 0.01 mm Less than 0.1 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Discrete or granular particles change their Shape Size None of these Weight Shape Size None of these Weight ANSWER DOWNLOAD EXAMIANS APP