Waste Water Engineering The layers of vegetable wastes and night soil alternatively piled above the ground to form a mound, is called None of these Plateau A heap Windrow None of these Plateau A heap Windrow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A circular sewer section is preferred to because It provides maximum hydraulic mean depth It provides maximum area for a given perimeter All listed here It is cheaper in construction It provides maximum hydraulic mean depth It provides maximum area for a given perimeter All listed here It is cheaper in construction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 5 days-biochemical oxygen demand (BOD5) is taken at a temperature of 0°C 25°C 20°C 15°C 0°C 25°C 20°C 15°C ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A jar A breaker A test tube An Imhoff cone A jar A breaker A test tube An Imhoff cone ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is 1 in 60 1 in 120 1 in 100 None of these 1 in 60 1 in 120 1 in 100 None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The grit chambers of sewage treatment plants, are generally cleaned after 2 days 7 days 14 days 12 days 2 days 7 days 14 days 12 days ANSWER DOWNLOAD EXAMIANS APP