Waste Water Engineering Pick up the incorrect statement from the following for allowing workers to enter sewers The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Proper tests for the presence of poisonous gases must be carried out The men entering the manhole should be advised to smoke in the sewer Warning signals should be erected The particular manhole and one manhole on upstream and one manhole on downstream should remain open for 30 minutes Proper tests for the presence of poisonous gases must be carried out ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 3.0 m 4.0 m 2.0 m 1.0 m 3.0 m 4.0 m 2.0 m 1.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The liquid wastes from kitchens, bath rooms and wash basins, is not called None of these Sewage Liquid waste Sullage None of these Sewage Liquid waste Sullage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The disintegrating pump in which solid matter is broken up before passing out, is Reciprocating pump Centrifugal pump Pneumatic ejector None of these Reciprocating pump Centrifugal pump Pneumatic ejector None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to measure Total solids Settleable solids Total in organic solids Total organic solids Total solids Settleable solids Total in organic solids Total organic solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering 3.0 ml of raw sewage is diluted to 300 ml. The D.O. concentration of the diluted sample at the beginning of the test was 8 mg/l. After 5 day-incubation at 20°C, the D.O. concentration was 5 mg/l. The BOD of raw sewerage is 300 mg/l 400 mg/l 100 mg/l 200 mg/l 300 mg/l 400 mg/l 100 mg/l 200 mg/l ANSWER DOWNLOAD EXAMIANS APP