Waste Water Engineering If the depletion of oxygen is found to be 5 ppm after incubating a 2.5% solution of sewage sample for 5 days at 21°C, B.O.D. of the sewage is 150 ppm 200 ppm 100 ppm 50 ppm 150 ppm 200 ppm 100 ppm 50 ppm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewerage system consists of House sewer All of these Lateral sewer Branch sewer House sewer All of these Lateral sewer Branch sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Tops of both the sewers are at the same level Top of larger sewer is kept lower None of these Top of smaller sewer is kept lower Tops of both the sewers are at the same level Top of larger sewer is kept lower None of these Top of smaller sewer is kept lower ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is 30 minutes 1 hour and 30 minutes 1 hour 2 hours 30 minutes 1 hour and 30 minutes 1 hour 2 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pH value of fresh sewage is usually Less than 7 More than 7 Equal to zero Equal to 7 Less than 7 More than 7 Equal to zero Equal to 7 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ¾th or ¼th extra space is left in sewer pipes at maximum discharge for Unexpected increase in population Low estimates of the average and maximum flows All listed here Large scale infiltration of storm water Unexpected increase in population Low estimates of the average and maximum flows All listed here Large scale infiltration of storm water ANSWER DOWNLOAD EXAMIANS APP