Waste Water Engineering For efficient working of a sewer, it must be ensured that Minimum velocity of 0.45 m/sec, is maintained at its minimum flow A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Neither (A) nor (B) Both (A) and (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Neither (A) nor (B) Both (A) and (B) ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which transports the sewage to the point of treatment, is called Main sewer Branch sewer Out-fall sewer House sewer Main sewer Branch sewer Out-fall sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the rugosity coefficient, is the bed slope of sewer, the velocity of flow in m/sec may be obtained by the formula V = (1/n) r2/3 s1/2 evolved by Chezy Manning Bazin Kutter Chezy Manning Bazin Kutter ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called all of these Depressed sewer Inverted syphon Sag pipe all of these Depressed sewer Inverted syphon Sag pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to measure Settleable solids Total solids Total organic solids Total in organic solids Settleable solids Total solids Total organic solids Total in organic solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering At the junction of sewers Tops of both the sewers are at the same level Top of larger sewer is kept lower Top of smaller sewer is kept lower None of these Tops of both the sewers are at the same level Top of larger sewer is kept lower Top of smaller sewer is kept lower None of these ANSWER DOWNLOAD EXAMIANS APP