Waste Water Engineering For efficient working of a sewer, it must be ensured that A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Neither (A) nor (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow A maximum velocity of 0.90 m/sec, is maintained at its maximum flow Both (A) and (B) Neither (A) nor (B) Minimum velocity of 0.45 m/sec, is maintained at its minimum flow ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in None of these Lakes Seas Rivers None of these Lakes Seas Rivers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In a fully mechanised composting plant, involves Mechanized receipt All of these Mechanized pulverising of refuse Mechanized segregation Mechanized receipt All of these Mechanized pulverising of refuse Mechanized segregation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Boussinesq’s equation for ascertaining unit pressure at a depth on sewers due to traffic loads, is pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 pt = 2H3p/3 Z5 pt = 3H3p/2 Z5 pt = 3H3p/2 Z5 pt = 2H3p/3 Z5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Imhoff cone is used to determine Settleable solids Dissolved solids None of these Suspended solids Settleable solids Dissolved solids None of these Suspended solids ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The liquid wastes from kitchens, bath rooms and wash basins, is not called Liquid waste None of these Sullage Sewage Liquid waste None of these Sullage Sewage ANSWER DOWNLOAD EXAMIANS APP