Waste Water Engineering In sewers the highest non-scouring velocity is achieved in Glazed bricks sewers Cast iron sewers Stone ware sewers Cement concrete sewers Glazed bricks sewers Cast iron sewers Stone ware sewers Cement concrete sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of bars for perforations in coarse screens used for the treatment of sewage, is 30 mm 40 mm 20 mm 50 mm 30 mm 40 mm 20 mm 50 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewers Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow All listed here Must be laid at least 2 to 3 m deep to collect /water from the basements Must flow under gravity ½ to ¾ full Must be of adequate size to avoid over flow All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering During preliminary treatment of a sewage Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers Floating materials are removed by screening All listed here Oil and grease are removed from skimming tanks Girt and sand are removed by girt chambers Floating materials are removed by screening All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if A sewer drops from a height A branch sewer joins the main sewer at higher level None of these A lamp is inserted to check obstruction A sewer drops from a height A branch sewer joins the main sewer at higher level None of these A lamp is inserted to check obstruction ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Aerobic bacterias Consume organic matter as their food Oxidise organic matter in sewage Flourish in the presence of free oxygen All of these Consume organic matter as their food Oxidise organic matter in sewage Flourish in the presence of free oxygen All of these ANSWER DOWNLOAD EXAMIANS APP