Waste Water Engineering The sewer that unloads the sewage at the point of treatment is called Outfall sewer Main sewer Branch sewer House sewer Outfall sewer Main sewer Branch sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers All listed here Main sewers Branch sewers Trunk sewers All listed here Main sewers Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Reciprocating pump Pneumatic ejector Centrifugal pump Air pressure pump Reciprocating pump Pneumatic ejector Centrifugal pump Air pressure pump ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Maximum permissible velocity 1.5 m/sec, is adopted in drains With beds of rocks and gravels Lined with stones Both A. and B. Neither A. nor B. With beds of rocks and gravels Lined with stones Both A. and B. Neither A. nor B. ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The discharge per unit plan area of a sedimentation tank, is generally called All of these Over flow rate Surface loading Over flow velocity All of these Over flow rate Surface loading Over flow velocity ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewage, the solids in mg per litre is 1000 to 1500 500 to 1000 100 to 500 1500 to 2000 1000 to 1500 500 to 1000 100 to 500 1500 to 2000 ANSWER DOWNLOAD EXAMIANS APP