Waste Water Engineering In sewers the velocity of flow should not be Less than 10 m/sec Less than the self-cleansing velocity More than the self-cleansing velocity More than 20 m/sec Less than 10 m/sec Less than the self-cleansing velocity More than the self-cleansing velocity More than 20 m/sec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In 1000 kg of sewage, the total solids approximate 5 kg to 7.5 kg 7.5 kg to 10 kg 0.5 to 1.0 kg 1 kg to 2.0 kg 5 kg to 7.5 kg 7.5 kg to 10 kg 0.5 to 1.0 kg 1 kg to 2.0 kg ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most efficient cross-section of sewers in a combined sewerage system is Rectangular New egged Parabolic Circular Rectangular New egged Parabolic Circular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In case of Imhoff tanks, Detention period is 2 hours The velocity of flow is restricted to 0.30 m/minute All of these The shape is rectangular Detention period is 2 hours The velocity of flow is restricted to 0.30 m/minute All of these The shape is rectangular ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rational formula for peak drainage discharge, was evolved by Fruhling Lloyd David All of these Kuichling Fruhling Lloyd David All of these Kuichling ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For laying a sewer line in a trench of 2 m width, an offset line is marked on the ground parallel to the given centre line at a distance of 140 cm 120 cm 100 cm 160 cm 140 cm 120 cm 100 cm 160 cm ANSWER DOWNLOAD EXAMIANS APP