Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 80 cm 100 cm 50 cm 90 cm 80 cm 100 cm 50 cm 90 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 2 minutes 3 minutes 5 minutes 1 minute 2 minutes 3 minutes 5 minutes 1 minute ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A rain sanitary sewer is constructed to carry Surface water Storm sewage Ground water Sanitary sewage Surface water Storm sewage Ground water Sanitary sewage ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The gas evolved in sewers is Hydrogen sulphide Carbondioxide All of these Methane Hydrogen sulphide Carbondioxide All of these Methane ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known House sewer Branch sewer Lateral sewer Sewer outfall House sewer Branch sewer Lateral sewer Sewer outfall ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 4 m 3.5 m 4.5 m 3 m 4 m 3.5 m 4.5 m 3 m ANSWER DOWNLOAD EXAMIANS APP