Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 90 cm 100 cm 50 cm 80 cm 90 cm 100 cm 50 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dry weather flow is: Average daily rate of flow Average annual rate of flow Average monthly rate of flow Water supply allowance per capita Average daily rate of flow Average annual rate of flow Average monthly rate of flow Water supply allowance per capita ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The recommended detention period for grit chambers is 3 minutes 1 minute 2 minutes 5 minutes 3 minutes 1 minute 2 minutes 5 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The clarigesters are Circular Imhoff double tanks with bottom hoppers Rectangular septic tanks Circular septic tanks Circular Imhoff double storey tanks without bottom hoppers Circular Imhoff double tanks with bottom hoppers Rectangular septic tanks Circular septic tanks Circular Imhoff double storey tanks without bottom hoppers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 2 to 3 5 to 10 3 to 5 1 2 to 3 5 to 10 3 to 5 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dried sewage after treatment is used as Fertilizer Building material Chemical for lowering B.O.D. Base material for paints Fertilizer Building material Chemical for lowering B.O.D. Base material for paints ANSWER DOWNLOAD EXAMIANS APP