Waste Water Engineering If the peak discharge of a storm water drain (S.W. Drain) is expected to exceed 150 cumecs, the free board to be provided, is 100 cm 50 cm 90 cm 80 cm 100 cm 50 cm 90 cm 80 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For treating the sewage of a large city, you will recommend A sedimentation tank and an activated sludge treatment plant A plant consisting of Imhoff tanks with low rate trickling filters None of these Sedimentation tanks with high rate trickling filters A sedimentation tank and an activated sludge treatment plant A plant consisting of Imhoff tanks with low rate trickling filters None of these Sedimentation tanks with high rate trickling filters ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewage is pumped up From basements All listed here From low lying areas From flat areas From basements All listed here From low lying areas From flat areas ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The factor responsible for purification of sewage in river is Hydrology All listed here Temperature Dissolved oxygen in water Hydrology All listed here Temperature Dissolved oxygen in water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The spacing of man holes along a straight portion of a sewer is 300 m, the diameter of the sewer may be 1.2 m > 1.5 m 1.5 m 0.9 cm 1.2 m > 1.5 m 1.5 m 0.9 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering ¾th or ¼th extra space is left in sewer pipes at maximum discharge for Large scale infiltration of storm water Low estimates of the average and maximum flows All listed here Unexpected increase in population Large scale infiltration of storm water Low estimates of the average and maximum flows All listed here Unexpected increase in population ANSWER DOWNLOAD EXAMIANS APP