Waste Water Engineering Dry water flow in a combined sewer, is Inclusive of domestic and industrial sewage but excludes storm water Industrial sewage Domestic sewage Storm water Inclusive of domestic and industrial sewage but excludes storm water Industrial sewage Domestic sewage Storm water ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 50 cm c/c 22.5 cm c/c 30 cm c/c 15 cm c/c 50 cm c/c 22.5 cm c/c 30 cm c/c 15 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel along its length A particle to travel from top surface to bottom sludge zone None of these The flow of sewage to fill the tank A particle to travel along its length A particle to travel from top surface to bottom sludge zone None of these The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is 6.5 m 5 m 5.5 m 7 m 6.5 m 5 m 5.5 m 7 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In sewage having fully oxidised organic matter, the nitrogen exists in the form of Aluminoid nitrogen Nitrites Free ammonia Nitrates Aluminoid nitrogen Nitrites Free ammonia Nitrates ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The liquid wastes from kitchens, bath rooms and wash basins, is not called None of these Liquid waste Sullage Sewage None of these Liquid waste Sullage Sewage ANSWER DOWNLOAD EXAMIANS APP