Waste Water Engineering In sewage, the solids in mg per litre is 1000 to 1500 500 to 1000 100 to 500 1500 to 2000 1000 to 1500 500 to 1000 100 to 500 1500 to 2000 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers All listed here Main sewers Branch sewers Trunk sewers All listed here Main sewers Branch sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The first stage of neutral process of sludge digestion, is Alkaline fermentation Acid regression None of these Acid fermentation Alkaline fermentation Acid regression None of these Acid fermentation ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The density of population over 40 hectares is 250/hectare. If water supply demand per day is 200 litres and sewage discharge is 80% of water supply, the sewage flow in sewers of separate system, is 0.0556 cumec 0.05556 cumec 0.05554 cumec 0.05552 cumec 0.0556 cumec 0.05556 cumec 0.05554 cumec 0.05552 cumec ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention period for plain sedimentation water tanks, is usually 16 to 24 hours 4 to 8 hours 24 to 36 hours 8 to 16 hours 16 to 24 hours 4 to 8 hours 24 to 36 hours 8 to 16 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The underground sewers are more subjected to Tensile force Compressive force Shearing force Bending force Tensile force Compressive force Shearing force Bending force ANSWER DOWNLOAD EXAMIANS APP