Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom Scouring occurs at bottom Both silting and scouring occur at bottom Neither silting nor scouring occurs at bottom Silting occurs at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sewer ventilating columns are generally placed at All listed here Every change in the size of sewers Upper ends of branch sewers Distances 150 m to 300 m All listed here Every change in the size of sewers Upper ends of branch sewers Distances 150 m to 300 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The arrangement made for passing the sewer line below an obstruction below the hydraulic gradient lines called Depressed sewer all of these Inverted syphon Sag pipe Depressed sewer all of these Inverted syphon Sag pipe ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In primary sedimentation, the 0.2 mm inorganic solids get separated if specific gravity is 2.5 2.55 2.65 2.25 2.5 2.55 2.65 2.25 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Two third full Half full Three fourth full Full depth Two third full Half full Three fourth full Full depth ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The standard B.O.D. of water is taken for 1 day 3 days 5 days 2 days 1 day 3 days 5 days 2 days ANSWER DOWNLOAD EXAMIANS APP