• HOME
  • QUIZ
  • CONTACT US
EXAMIANS
  • COMPUTER
  • CURRENT AFFAIRS
  • ENGINEERING
    • Chemical Engineering
    • Civil Engineering
    • Computer Engineering
    • Electrical Engineering
    • Mechanical Engineering
  • ENGLISH GRAMMAR
  • GK
  • GUJARATI MCQ

Waste Water Engineering

Waste Water Engineering
Primary treatment of sewage consists of removal of

Large suspended organic solids
Oil and grease
Sand and girt
Floating materials

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The sewage discharge in a detritus tank of a treatment plant is 576 litres/sec with flow velocity of 0.2 m/sec. If the ratio of width to depth is 2, the depth is

110 cm
120 cm
150 cm
100 cm

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The recommended detention period for grit chambers is

1 minute
5 minutes
3 minutes
2 minutes

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
For efficient working of a sewer, it must be ensured that

A maximum velocity of 0.90 m/sec, is maintained at its maximum flow
Minimum velocity of 0.45 m/sec, is maintained at its minimum flow
Neither (A) nor (B)
Both (A) and (B)

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
Oxidation process results in the formation of

Nitrates
All of these
Carbon dioxide
Sulphates

ANSWER DOWNLOAD EXAMIANS APP

Waste Water Engineering
The algae dies out in the zone of

Degradation
Cleaner water
Recovery
Active decomposition

ANSWER DOWNLOAD EXAMIANS APP
MORE MCQ ON Waste Water Engineering

DOWNLOAD APP

  • APPLE
    from app store
  • ANDROID
    from play store

SEARCH

LOGIN HERE


  • GOOGLE

FIND US

  • 1.70K
    FOLLOW US
  • EXAMIANSSTUDY FOR YOUR DREAMS.
  • SUPPORT :SUPPORT EMAIL ACCOUNT : examians@yahoo.com

OTHER WEBSITES

  • GUJARATI MCQ
  • ACCOUNTIANS

QUICK LINKS

  • HOME
  • QUIZ
  • PRIVACY POLICY
  • DISCLAIMER
  • TERMS & CONDITIONS
  • CONTACT US
↑