Waste Water Engineering Primary treatment of sewage consists of removal of Sand and girt Large suspended organic solids Floating materials Oil and grease Sand and girt Large suspended organic solids Floating materials Oil and grease ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering With self cleansing velocity in sewers Scouring occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom Scouring occurs at bottom Neither silting nor scouring occurs at bottom Both silting and scouring occur at bottom Silting occurs at bottom ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The ratio of minimum hourly flow to the average flow of sewage is 43894 43833 43832 43834 43894 43833 43832 43834 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering In detritus tanks, All listed here Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes All listed here Organic and inorganic materials are separated Flow velocity is kept 0.09 m/sec Detention period is kept 3 to 4 minutes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The discharge per unit plan area of a sedimentation tank, is generally called All of these Over flow rate Over flow velocity Surface loading All of these Over flow rate Over flow velocity Surface loading ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A rainfall may be classified as acidic if its pH value is less or equal to 6.5 6 5 7 6.5 6 5 7 ANSWER DOWNLOAD EXAMIANS APP