Waste Water Engineering Primary treatment of sewage consists of removal of Oil and grease Sand and girt Large suspended organic solids Floating materials Oil and grease Sand and girt Large suspended organic solids Floating materials ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Hazen’s formula VS = 418 (GS – Gw)d [(3T + 70)/100] is used for the settlement velocity of the particles of diameter Less than 0.01 mm Less than 0.05 mm Greater than 0.1 mm Less than 0.1 mm Less than 0.01 mm Less than 0.05 mm Greater than 0.1 mm Less than 0.1 mm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Sludge banks are formed if sewage is disposed of in None of these Seas Lakes Rivers None of these Seas Lakes Rivers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer which collects the discharge from a collecting system and delivers it to a treatment plant, is known Sewer outfall Branch sewer Lateral sewer House sewer Sewer outfall Branch sewer Lateral sewer House sewer ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If the length of overland flow from the critical point to the mouth of drain is 13.58 km and difference in level between the critical point and drain mouth is 10 m, the inlet time is 8 hours 2 hours 4 hours 6 hours 8 hours 2 hours 4 hours 6 hours ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most widely used pump for lifting sewage is Reciprocating pump Air pressure pump Centrifugal pump Pneumatic ejector Reciprocating pump Air pressure pump Centrifugal pump Pneumatic ejector ANSWER DOWNLOAD EXAMIANS APP