Waste Water Engineering Primary treatment of sewage consists of removal of Sand and girt Floating materials Large suspended organic solids Oil and grease Sand and girt Floating materials Large suspended organic solids Oil and grease ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering It is customary to design a sewer for D.W.F. on the basis of Four times the average demand Twice the average demand Thrice the average demand Average demand Four times the average demand Twice the average demand Thrice the average demand Average demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum diameter of sewers adopted in the designs is 4.0 m 2.0 m 3.0 m 1.0 m 4.0 m 2.0 m 3.0 m 1.0 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Clogging of sewers, is caused due to Silting All of these Greasy and oily matters Low discharge Silting All of these Greasy and oily matters Low discharge ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bottom openings 15 cm × 15 cm in the standing baffle wall are provided 30 cm c/c 15 cm c/c 22.5 cm c/c 50 cm c/c 30 cm c/c 15 cm c/c 22.5 cm c/c 50 cm c/c ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The rate of accumulation of sludge per person per year, is 10 litres 20 litres 15 litres 25 litres 10 litres 20 litres 15 litres 25 litres ANSWER DOWNLOAD EXAMIANS APP