Waste Water Engineering Aerobic activity is maximum At sewer pipes In freshly produced sewage None of these In sewer treatment plants At sewer pipes In freshly produced sewage None of these In sewer treatment plants ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The design period in years for pumping plants, is 1 3 to 5 5 to 10 2 to 3 1 3 to 5 5 to 10 2 to 3 ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For a continuous flow type of sedimentation tanks Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here Width of the tank is normally kept about 6 m Maximum horizontal flow velocity is limited to 0.3 m/minute Length of the tank is normally kept 4 to 5 times the width All listed here Width of the tank is normally kept about 6 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For evaporation and measurement of settable solids, the apparatus used, is A jar A test tube An Imhoff cone A breaker A jar A test tube An Imhoff cone A breaker ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The pressure exerted by The sewage when running full from inside, is called internal pressure The internal pressure if any, causes tensile stress in the pipe material Pressure sewers are designed to be safe in tension All listed here The sewage when running full from inside, is called internal pressure The internal pressure if any, causes tensile stress in the pipe material Pressure sewers are designed to be safe in tension All listed here ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the beginning of sewer line At the end of septic tanks With a W.'trap On manholes At the beginning of sewer line At the end of septic tanks With a W.'trap On manholes ANSWER DOWNLOAD EXAMIANS APP