Waste Water Engineering Aerobic activity is maximum In freshly produced sewage In sewer treatment plants At sewer pipes None of these In freshly produced sewage In sewer treatment plants At sewer pipes None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Disposal to sewage in large cities, is done in Irrigation Purification Oxidation Dilution Irrigation Purification Oxidation Dilution ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Are available in size Stoneware sewers 20 cm All of these 10 cm 15 cm 20 cm All of these 10 cm 15 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The coagulant which is generally not used for treating the sewage, is Chlorinated coppers Ferric chloride Ferric sulphate Alum Chlorinated coppers Ferric chloride Ferric sulphate Alum ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The minimum diameter of a sewer is kept 10 cm 20 cm 15 cm 25 cm 10 cm 20 cm 15 cm 25 cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering A drop manhole is provided if A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level None of these A sewer drops from a height A lamp is inserted to check obstruction A branch sewer joins the main sewer at higher level None of these A sewer drops from a height ANSWER DOWNLOAD EXAMIANS APP