Waste Water Engineering Aerobic activity is maximum None of these In freshly produced sewage In sewer treatment plants At sewer pipes None of these In freshly produced sewage In sewer treatment plants At sewer pipes ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The maximum depth of sedimentation tanks, is kept 3 m 3.5 m 4.5 m 4 m 3 m 3.5 m 4.5 m 4 m ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Antisyphonage pipe is fitted At the end of septic tanks With a W.'trap On manholes At the beginning of sewer line At the end of septic tanks With a W.'trap On manholes At the beginning of sewer line ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The most effective arrangement for diverting excess storm water into a natural drainage, is Overflow weir None of these Leaping weir Siphon spill way Overflow weir None of these Leaping weir Siphon spill way ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The detention time (t) of a settling tank, may be defined as the time required for A particle to travel from top surface to bottom sludge zone None of these A particle to travel along its length The flow of sewage to fill the tank A particle to travel from top surface to bottom sludge zone None of these A particle to travel along its length The flow of sewage to fill the tank ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The porosity of sediments in sewer pipes, is usually taken as 0.011 0.013 0.012 0.01 0.011 0.013 0.012 0.01 ANSWER DOWNLOAD EXAMIANS APP