Waste Water Engineering Aerobic activity is maximum In freshly produced sewage At sewer pipes In sewer treatment plants None of these In freshly produced sewage At sewer pipes In sewer treatment plants None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering The sewer pipes All listed here Are designed for generating self-cleansing velocities at different discharge Carry sewage as gravity conduits Should resist the wear and tear caused due to abrasion All listed here Are designed for generating self-cleansing velocities at different discharge Carry sewage as gravity conduits Should resist the wear and tear caused due to abrasion ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Bio-chemical oxygen demand (BOD) for the first 20 days in generally referred to Initial demand All of these Carbonaceous demand First stage demand Initial demand All of these Carbonaceous demand First stage demand ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dilution method of disposing of sewage, is not preferred to When sewage is fresh When diluting water is used for water supply near the point of sewage disposed When the diluting water is having flow currents When diluting water has high dissolved oxygen content When sewage is fresh When diluting water is used for water supply near the point of sewage disposed When the diluting water is having flow currents When diluting water has high dissolved oxygen content ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Dried sewage after treatment is used as Chemical for lowering B.O.D. Fertilizer Base material for paints Building material Chemical for lowering B.O.D. Fertilizer Base material for paints Building material ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For trunk and out-fall, the type of sewers generally used, is Horse shoe shaped Standard egg shaped Circular shaped Parabolic shaped Horse shoe shaped Standard egg shaped Circular shaped Parabolic shaped ANSWER DOWNLOAD EXAMIANS APP