Waste Water Engineering Aerobic activity is maximum In freshly produced sewage At sewer pipes In sewer treatment plants None of these In freshly produced sewage At sewer pipes In sewer treatment plants None of these ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering You are asked to design sewer pipes of diameters 0.4 m to 0.9 m at maximum flow, you will assume the sewer flow running at Full depth Three fourth full Half full Two third full Full depth Three fourth full Half full Two third full ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering For design purposes, the normal rate of infiltration of ground water into the sewer, is 1500 litres/km/cm 2000 litres/km/cm 1000 litres/km/cm 500 litres/km/cm 1500 litres/km/cm 2000 litres/km/cm 1000 litres/km/cm 500 litres/km/cm ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Skimming tanks are Improved version of grit chambers Tanks provided with self- cleansing screens Those from which sludge is skimmed out Used to remove the grease and oil Improved version of grit chambers Tanks provided with self- cleansing screens Those from which sludge is skimmed out Used to remove the grease and oil ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering Design period of 40 to 50 years is adopted for Trunk sewers Branch sewers All listed here Main sewers Trunk sewers Branch sewers All listed here Main sewers ANSWER DOWNLOAD EXAMIANS APP
Waste Water Engineering If is the diameter of upper circular portion, the overall depth of a standard egg shaped section, is 1.25 D 1.15 D 1.75 D 1.5 D 1.25 D 1.15 D 1.75 D 1.5 D ANSWER DOWNLOAD EXAMIANS APP